In most plants, every unit keeps its own report in its own file. Sales calculates tonnage separately, production control takes tank inventory from another source, energy records consumption in a third file, and management meets three different numbers in the same meeting. The problem is not one person’s accuracy; it is the absence of a shared reference.
One platform, six systems
PDMS brings six specialist systems into one shared architecture: Integrated Sales, Shift Superintendent, Production Control, Energy Management, Production Optimization, and Tank Tonnage Calculation. Each system does its own job while sharing the underlying data.
How the data flows
Raw data enters from the industrial network (DCS), power and steam meters, shift forms, and sales documents. The shared core cleans, reconciles, and calculates it. The result leaves as management dashboards, mass and energy balance, period reports, and decision scenarios.
What changes
- Sales tonnage reconciles with tank inventory and output
- Shift reports feed production control and energy management
- Mass balance becomes the shared basis for profit-and-loss reporting
- Production scenarios are built from the same real numbers
- Every number in a management report has a traceable source
PDMS is not meant to replace existing systems; it builds a shared layer that connects them and removes duplicated, conflicting data.